General Contractor: Axiom Construction
Subcontracted to provide all labor, materials, equipment, scaffolding and formwork for columns, decking, shearwalls and slabs.
Located on South Krome Avenue & West Mowry Drive
Parking Garage 1,000+ Parking Spaces
150,000 Square Feet property
30,000 Square Feet of retail
General Contractor: Burke Construction Group
Scope of work: Management of demolition, renovations, and the coordination of all trades for a resort located in Naples, FL.
General Contractor: MCM
Scope of work: Selective demolition, steel reinforcement, masonry and concrete for renovations and new elevator located on East 33 Street Hialeah, FL
General Contractor: DEC Contracting Group, Inc.
Scope of work: Six buildings for a new school located in Immokalee, FL. Packages included masonry, shoring, steel reinforcement and concrete. This project utilized curved concrete roofs and form liners.
General Contractor: TGSV Enterprises Inc.
Scope of work: Grade beams, cast in place retaining wall, slab on grade and the Tilt-Up wall package for the new Medical Arts Building in Marathon, Florida.
General Contractor: KVC Constructors Inc.
The Structure Group LLC, we specialize in providing top-notch construction management services to our clients. Our team of experts ensures that every project is completed on time and within budget, while maintaining the highest standards of quality.
General Contractor: Burke Construction Group
Scope of work: Selective demolition. Concrete shell for foundations, slab on grade, ramp and masonry walls.
General Contractor: Burke Construction Group
Scope of work: Concrete shell for foundations, slab on grade, columns, beams, ramp and masonry walls.
General Contractor: Fincantieri Infrastructure Florida, Inc.,
Terminal Scope of work: CMU Masonry
Parking garage: Cast in place concrete
Client: BACALLO CONSTRUCTION& ENGINEERING
The Structure Group LLC performed the layout, fine grading, form work, rebar placement, Concrete placement, masonry and truss labor for an office/warehouse.
General Contractor: Lemartec
Scope of work performed by The Structure Group LLC included the Masonry, Slab on Grade, Mezzanine form work and pour, Cast in place for art sculpture and foundations for covered walkway. This was a prevailing wage project.
General Contractor: OHL Building Inc.
Scope of work performed by The Structure Group LLC were approximately 8,000 sqft concrete package including, rebar, concrete finishing, form work and block work for precast topping slabs, elevator stoops, curbs and wash areas.
General Contractor: Prime Home Builders
Located ocean side in Key Largo; The Structure Group, llc performed the shell, floor joist and truss packages for eight new homes.
General Contractor: Ashford International, LLC
The Structure Group LLC was subcontracted for building 101A, 101B and Building 55 to perform excavation, rebar, form work, concrete placement, fine grading, vapor barrier, wire mesh, concrete and concrete finishing for slab on grade. Stem walls. Equipment and housekeeping pads. Saw cutting and sidewalk replacement. Install embeds and new masonry.
General Contractor: MCM
In North Miami Beach at Alonzo and Tracy Mourning Highschool, The Structure Group, llc is contracted by MCM to building the shell package for foundations new basket ball poles, benches, foundations for aluminum, canvas canopies and new classroom additions.
General Contractor: Camps Construction Consulting
Located in Pinecrest, Florida. As a subcontractor The Structure Group, LLC was responsible for removing, trusses, sheathing, tile, fixtures, cabinets and vanities, drywall, furring, doors and frames. Then installed new trusses, sheathing, bracing, CMU, retrofit window, new slabs, columns, beams, and wood partitions.
General Contractor: MCM
Located in Sweetwater; The Structure Group LLC was subcontracted to install the roof structure system.
General Contractor: Lemartec
The Structure Group, llc was subcontracted to perform the shell labor package for the new Carnival Cruise terminal.
General Contractor: Lemartec
New hangers were constructed at Opa Locka General Airport and The Structure Group, llc performed the masonry and shell package.
General Contractor: Lemartec
The Structure Group, llc performed the scope of work for the shell package, including the shoring, rigging, and safety for the new Brightline train station in Aventura.
General Contractor: Burke Construction Group Inc.
Located in Islamorada Florida, The Structure Group, llc was subcontracted to build the shell for the new hotel wing, conference center and affordable housing for employees.
General Contractor: Hensel Phelps
This bonded, government project for the City of Fort Lauderdale included new foundations, slab on grade, concrete and masonry walls and precast concrete plank roof for each new building. The Structure group also constructed the new pool decks and curbs.
General Contractor: MCM
The Structure Group provided a full shell package for two replacement buildings in two different locations at the same time in West Palm.
General Contractor: Titan Construction Group, inc.
The Structure Group, llc performed the Masonry and Concrete package for the project including the roof trusses and sheathing.
General Contractor: OHL Building, inc
At South West Miami Senior High School, TSG installed new masonry wall, curbs, window sill and a new concrete walkway.
General Contractor: Waypoint Contracting, Inc.
As a the Concrete subcontractor, The Structure Group, llc constructed the Restroom Building & Monument sign.
General Contractor: Lemartec
The Structure Group llc performed shell construction for the new Maintance Hanger, FPL Vault and five story office building located in the Port of Miami. Our employees are both badge for TWIC and POM.
General Contractor: Titan Construction Group
The Grove Bay Parking Garage is part of Coconut Groves waterfront development call The Harbour. The Structure Group, LLC was subcontracted to provide all labor, materials, equipment, scaffolding and formwork for columns, decking, shearwalls and slabs.
General Contractor: Formcrete
Located in Fort Lauderdale, The Structure Group, llc was subcontracted to provide labor for excavation, forming, decking, shearwalls and slab on grade.
The Structure Group, llc is the general contractor providing labor and materials to remodel the ballroom and add new balconies to overlook the pool, beach and ocean in Miami Beach
General Contractor: Formcrete
A new home is ideal for the owner who is looking to have quality construction that is up to the latest codes. The owner will have a new more open floor plan with living space for more than one generation, lower energy cost and space to personalize their home.
Axiom Construction
Formcrete
M.C.M. Corporation
Miller & Solomon General Contractors, Inc.
Gryphon Construction, LLC
Coastal Construction Co.
Shafer & Miller, Inc
Betancourt Castellon, Assoc.
AutoBuilders General Contracting Services, Inc.
Suffolk Construction Co
Stiles Construction Co.
Maleta Construction Co.
Max South Constructio
Beauchamp Construction
K&A Lumber Company
Turnberry Associates
Rothstar Construction
The Poole & Kent Co.
Curtis James Construction
F & M Contractors, Inc.
Stobs Bros. Construction
Shaver Construction
Greenberg Construction
LCI Construction of S. FL
Trek II Construction, Corp.
TGSV Enterprises, Inc.
Cuesta Construction Corp.
Crompton Construction Co.
BRV Construction Services
Modular Contractors, Inc
Hensel Phelps Construction
Lemartec Engineering
C.G Chase Construction
Bascon, Inc
360 Builders, LLC
Lewis-Barnes Construction
Summit Structures, LLC
Metro Rail Station
Jackson Memorial Hospital
Northside Fire Station
Weeks Air Museum
Greater Miami Academy
St. Agatha Church
MIA, Concourses D,F & G
M&M Aerospace
Beckman Coulter
Killian Senior H.S.
Southwest Senior H.S.
Santa Clara Elementary School
Dade Chrysler Dodge Jeep
Palm Ransom Everglades Elementary Middle Campus Gymnasium & Auditorium
West Kendall Toyota
UM School of Communication
UM School of Nursing
Temple Beth Am
City National Bank
Flagler Heights Condominiums
Bethsabe, LLC Warehouse
Henry Filer Middle School
Homestead City Hall
Homestead Police Station
Homestead Station / Showbiz
Homestead WWTP
South Baptist Church
Harris Field Complex
Harris Field Pavilion
Redland Elementary School
Air Force Base Alert Shelter
Air Force Base Housing
Portions of Homestead Motorsports Complex
K&A Lumber Yard
Miami-Dade Community College Aviation Training Facility
Homestead Car Wash
H.A.R.B. Visiting Quarters
Cracker Barrel
Applebee’s
Largo Honda